Logistics Center

Gas purification units UOGA-10, UOGA-10A and UOGA-100

Category:
Laboratory, Industrial Tools
SKU:
UOGA-10, UOGA-10A
{{variant.name}}:
{{opt.name}}
{{opt.value ? '' : opt.name}}
{{opt.value ? '' : opt.name}}
Description

Gas purification units UOGA-10, UOGA-10A, UOGA-100 are used to purify the following process gases from oxygen, water vapors and dust impurities:

- technical gaseous premium class nitrogen GOST 9293-74;
- gaseous helium TU 51-940-80;
- gaseous argon GOST 10157-79.

 

Gas purification units are cooled by drinking water according to GOST 2874-82 supplied at the pressure of 0.1-0,4 Mpa and flow rate 0.1 m3/hour (for purification units UOGA-10 and UOGA-10A) and 0.2 m3/hour (for UOGA-100 unit). Recovery of nickel- chromium catalyst in purification unit UOGA-10 requires supply of technical grade A hydrogen according to GOST 3022-80 at the pressure of 0.05-0.1 MPa and flow rate not less than 0.2 m3/hour. Purification unit UOGA-100 requires nitrogen-hydrogen mixture (technical gaseous grade A hydrogen according to GOST 3022-80 at the pressure of 0.05-0.07 MPa and flow rate 0.2 m3/hour and gaseous nitrogen according to GOST 9293-74 at the pressure of 0.05-0.07 MPa and flow rate 0.7 m3/hour.

 

Operation of gas purification units UOGA-10 and UOGA-100 is based on the principle of binding of oxygen impurities by nickel-chromium catalyst. Water vapors, nitrogen oxides, and carbon are absorbed by NaX zeolite. Dust particles are extracted by E1-100190 fabric GOST 19907-83 and woven-screen filter element LFS-2 TU 95-404-76.

 

Operation of argon purification unit UOGA-10A is based on the principle of binding of chemically active impurities in raw argon by calcium vapors at the temperature of 973 °K (700 °С).

 

Connection dimensions of the purification units:

 

UOGA-10

  • Gas input and output through connecting pipe M30x1.5-8g Dn=15 mm;
  • Regeneration waste is discharged through an after-burning device, included in the spare parts and accessories kit;
  • Water is supplied and drained through connecting pipe 1/2 inches B;
  • Condensate is drained through connecting pipe 1/2 inches B;

 

UOGA-10A

  • Gas input and output through connecting pipe M24 x1.5-8g Dn=15 mm;
  • unit is purged through the connecting pipe M16x1-8g Dn=15 mm;
  • Water is supplied and drained through connecting pipe 1/2 inches B;

 

UOGA-100

  • Input and output through flange connection by tube 25X2.5-12X18N10T GOST 9941-72. Connecting pipes and flanges for welding are mounted on the unit;
  • Regeneration waste is discharged through an after-burning device, included in the spare parts and accessories kit;
  • Water and condensate are supplied and drained through connecting pipes 1/2 inches, taps 1/2 inches are included in the spare parts and accessories kit;
  • Nitrogen- hydrogen mixture is supplied through tube 10X1-12X18H10T GOST 9941-72. Nipple and nut for welding are located on the unit;