logo-mondome-enteprise

Precision.

Sourced.

Delivered.

Malaysia's trusted procurement partner for laboratory
instruments, industrial machinery and medical devices. Serving
government, research and private sectors with uncompromising
standards since 2017.

Who We Are

Founded by Puan Jamilah Binti Bunyamin, Mondome Enterprise connects Malaysian organisations to world-class equipment manufacturers, with the reliability, expertise and service that professionals demand.

 

  1. Rigorous quality control
    We partner exclusively with trusted manufacturers and verify every
    product before it reaches you.
     
  2. On-time, every time
    From enquiry to delivery, we manage the full procurement chain so your
    operations stay on schedule.
     
  3. Sector-specific expertise
    Deep knowledge across laboratory, industrial and medical domains means
    we understand your requirements, not just your purchase order.

8

+

Years of Service

190

+

Clients Served

3

Core Sectors

93

%

Satisfaction Rate

How It Works

A clear, straightforward

procurement process

01 - Submit your enquiry

 

Share your requirements, specifications or product list. We respond within 24 business hours.

 

02 - Receive a tailored quote

 

We source and price your requirements accurately with full product specifications.

 

03 - Confirm & procure

 

We manage the full procurement cycle, manufacturer liaison, logistics and coordination.

 

04 - Delivery & support

 

Safe, on-time delivery with continued after-sales support from our technical team.

 

Video Laryngoscope

Product introduction: The handheld Video Laryngoscope (VL) is designed for quicker & precise intubation. It provides a consistent, clear, real-time view of the patient’s airway to enable successful intubation.

Gas purification units UOGA-10, UOGA-10A and UOGA-100

Category:
Laboratory, Industrial Tools
SKU:
UOGA-10, UOGA-10A
{{variant.name}}:
{{opt.name}}
{{opt.value ? '' : opt.name}}
{{opt.value ? '' : opt.name}}
Description

Gas purification units UOGA-10, UOGA-10A, UOGA-100 are used to purify the following process gases from oxygen, water vapors and dust impurities:

- technical gaseous premium class nitrogen GOST 9293-74;
- gaseous helium TU 51-940-80;
- gaseous argon GOST 10157-79.

 

Gas purification units are cooled by drinking water according to GOST 2874-82 supplied at the pressure of 0.1-0,4 Mpa and flow rate 0.1 m3/hour (for purification units UOGA-10 and UOGA-10A) and 0.2 m3/hour (for UOGA-100 unit). Recovery of nickel- chromium catalyst in purification unit UOGA-10 requires supply of technical grade A hydrogen according to GOST 3022-80 at the pressure of 0.05-0.1 MPa and flow rate not less than 0.2 m3/hour. Purification unit UOGA-100 requires nitrogen-hydrogen mixture (technical gaseous grade A hydrogen according to GOST 3022-80 at the pressure of 0.05-0.07 MPa and flow rate 0.2 m3/hour and gaseous nitrogen according to GOST 9293-74 at the pressure of 0.05-0.07 MPa and flow rate 0.7 m3/hour.

 

Operation of gas purification units UOGA-10 and UOGA-100 is based on the principle of binding of oxygen impurities by nickel-chromium catalyst. Water vapors, nitrogen oxides, and carbon are absorbed by NaX zeolite. Dust particles are extracted by E1-100190 fabric GOST 19907-83 and woven-screen filter element LFS-2 TU 95-404-76.

 

Operation of argon purification unit UOGA-10A is based on the principle of binding of chemically active impurities in raw argon by calcium vapors at the temperature of 973 °K (700 °С).

 

Connection dimensions of the purification units:

 

UOGA-10

  • Gas input and output through connecting pipe M30x1.5-8g Dn=15 mm;
  • Regeneration waste is discharged through an after-burning device, included in the spare parts and accessories kit;
  • Water is supplied and drained through connecting pipe 1/2 inches B;
  • Condensate is drained through connecting pipe 1/2 inches B;

 

UOGA-10A

  • Gas input and output through connecting pipe M24 x1.5-8g Dn=15 mm;
  • unit is purged through the connecting pipe M16x1-8g Dn=15 mm;
  • Water is supplied and drained through connecting pipe 1/2 inches B;

 

UOGA-100

  • Input and output through flange connection by tube 25X2.5-12X18N10T GOST 9941-72. Connecting pipes and flanges for welding are mounted on the unit;
  • Regeneration waste is discharged through an after-burning device, included in the spare parts and accessories kit;
  • Water and condensate are supplied and drained through connecting pipes 1/2 inches, taps 1/2 inches are included in the spare parts and accessories kit;
  • Nitrogen- hydrogen mixture is supplied through tube 10X1-12X18H10T GOST 9941-72. Nipple and nut for welding are located on the unit;

 

 

Contacts

Address:

Mondome Enterprise

A-15-01, Pinnacle

Lorong Utara C

46200 Petaling Jaya

Selangor, Malaysia.

Phone:

+6011.2812.7629

Email:

[email protected]

Have you signed up for our exclusive offers?

Email *

2026

© Mondome Enterprise